Salient Features of Kumarghat - Agartala New Rail Lane

 

 

Sl.No. Length 109 Kms
1. Cost 879 crores
2. Requirement of Land 1950 acres
3. Earthwork Quantity 225 lacs cum
4. Bank 100 lacs cum
5. Max.height of bank 30 M
6. Max.depth of cutting 35 M
7. Tunneling 5 Kms
8. Bridges 181
9. Important 3
10. Major 12
11. Minor 170
12. Road Crossing
13. 'A' Class
14. 'B' Class 5
15. 'C' Class 19
16. ROBs 13
17. RUBs 12
18. Ruling Gradient 1 in 60 (C)
19. Max.Degree of Curvature 5
20. Track structure M+7
21. Rails 52 Kg
22. Sleepers PSC
23. Ballast 250-300 mm
24. Signalling Panel
25. Standard I